LIST OF EXPERIMENTS
1.Intoduction of Relay and Contactor.
2.Introduction of Proximity Sensor, Capacitive & Photoelectric Sensor, Limit Switch.
3.Introduction to Pressure Switch, Electrical Counter, ON Timer & OFF Timer.
4.Operation of single acting cylinder with single sol. valve and single limit switch.
5.Operation of double acting cylinder with single sol. valve and single limit switch.
6.Continuous operation of double acting cylinder with single solenoid valve and two limit switches.
7.Operation of double acting cylinder with single solenoid valve, AND gate of electrical switches.
8.Operation of double acting cylinder with single solenoid valve, OR gate of electrical switches.
9.Operation of double acting cylinder with single solenoid valve, NOR gate of electrical switches.
10.Operation of double acting cylinder with single solenoid valve, NAND gate of electrical switches.